Henderson Way Road Improvements

Suitland, Maryland

Henderson Way Road Improvements

Suitland, Maryland

Bowman Consulting completed design efforts for the 3.8-acre site, which is zoned C-O. The project required engineering efforts from Detailed Site Plan through Final Engineering and Surveying. Additionally, permitting and construction oversight will be completed. This site proposes a 6-story building with a total of 119 units. The building includes an indoor pool and other surrounding amenities. Frontage roadway improvements were required in two (2) locations for the project. The site is accessed from existing Mercedes Boulevard, a County road. A project entrance was designed to accommodate the existing roadway features. Additionally, the project has frontage along existing Henderson Way, a County road, however the project is not accessed from Henderson Way. The project conditions of approval required the completion to the ultimate roadway right-of-way building in accordance with County standards and specifications. This build out includes; roadway widening, street trees, street lights and the design of an entrance to accommodate an existing County storm water management facility.